Previous Projects
Structural Design
Forensic Engineering
Special Inspection
- Second floor framing addition (approx. 1,300 SF) on existing first floor, detached garage & cabana framing & foundation – Dallas, TX (3/2016)
- Wood Stair & Balcony Framing & Foundation – Fort Worth, TX (3/2016)
- Re-design second floor framing due to structural framing damage from tornado on 12/26/2015 – Rowlett, TX (3/2016)
- Renovation (Ceiling Beams = 8’-0” & 32’-6”) – Dallas, TX (2/2016)
- Remodeling (Ceiling Beams = 10’-0”, 10’-0” & 14’-0”) – Carrollton, TX (2/2016)
- Roof Fire Damaged Re-Framing – Denton, TX (2/2016)
- Re-design garage roof framing due to structural framing damage from tornado on 12/26/2015 – Rowlett, TX (1/2016)
- Patio Framing & Foundation Design – Coppell, TX (1/2016)
- Patio Framing & Foundation Design – Arlington, TX (1/2016)
- Framing Renovation (Ceiling Beams = 21’-4” & 24’-6”) – Dallas, TX (1/2016)
- Apartment Metal Stair & Balcony Failure & Re-design – Dallas, TX (2014 & 2015)
- Renovation (several ceiling beams & new wood stair) – Dallas, TX (12/2015)
- Addition Foundation & Framing (approx. 240 SF) – Dallas, TX (12/2015)
- First & Second Floor Renovation (several ceiling beams & new metal stair) – Dallas, TX (11/2015)
- Two-Story Addition Foundation & Framing (approx. 2,000 SF) – Dallas, TX (11/2015)
- Second Floor Addition of Existing Attic Space (approx. 500 SF) – Providence Village, TX (11/2015)
- Garage & Porch Addition Foundation & Framing (approx. 800 SF) – Plano, TX (11/2015)
- Two-story Foundation & Framing (approx. 3,400 SF) – Dallas, TX (10/2015)
- Garage Addition Foundation & Framing (approx. 400 SF) – Dallas, TX (9/2015)
- Gazebo Pier Foundation to support Steel Framing by Manufacturer – Dallas, TX (9/2015)
- Master Bathroom Addition Foundation & Framing (approx. 63 SF) – Plano, TX (9/2015)
- Renovation (First & Second Floor Ceiling Beams = 12’-0”, 12’-8” & 16’-0”), Balcony Framing & Wood Stair – Fort Worth, TX (9/2015)
- Addition Foundation & Framing (approx. 668 SF) – Dallas, TX (9/2015)
- Ceiling Beam (approx. 17’-3”) – Dallas, TX (8/2015)
- Second Floor Addition Framing (approx. 1,640 SF) – Irving, TX (8/2015)
- Addition Foundation & Framing (approx. 420 SF) – Dallas, TX (6/2015)
- Addition Foundation & Framing (approx. 500 SF) – Rockwall, TX (6/2015)
- Garage Headers (12’-0” & 16’-0”) & Bump-Out Foundation & Framing (approx. 42 SF) – Dallas, TX (5/2015)
- Renovation, 2nd floor framing & Patio Foundation & Framing (approx. 1,240 SF) – Audrey, TX (5/2015)
- Family Room Renovation (Ceiling Beams = 19’-0” & 23’-0”) – Dallas, TX (4/2015)
- Foyer Addition Foundation & Framing – Richardson, TX (12/2014)
- Ceiling Beam (approx. 22’-5”) – Irving, TX (12/2014)
- Remodel (Ceiling Beam = 9’-6”) – Plano, TX (12/2014)
- Outdoor Kitchen Foundation (approx. 276 SF) – Southlake, TX (11/2014)
- Renovation & Inspection - roof framing at the patio, 2 bay windows & front porch, ceiling framing throughout the structure with exceptions of the master bedroom and garage, and patio foundation (approx. 3,100 SF) – Dallas, TX (10&11/2014)
- Slab Foundation & Framing (Porch = 310 SF, Foyer = 169 SF, Gallery = 738 SF & Dining Room = 54 SF) Remodel – Dallas, TX (9/2014)
- Renovation (Ceiling Beams = 13’-0”, 18’-10”, 20’-3”(2) & 1 Header) – Richardson, TX (8/2014)
- Ceiling Beam (approx. 20’-0”) – Dallas, TX (8/2014)
- Garage Ceiling Beam (approx. 22’-0”) – Hutchins, TX (6/2014)
- Kitchen Ceiling Beam (approx. 14’-8”) – Southlake, TX (6/2014)
- Post-tensioned Slab Foundation (approx. 1,200 SF) – Grand Prairie, TX (5/2014)
- Wood Stair Renovation – McKinney, TX (5/2014)
- Kitchen Renovation (Ceiling Beam = 13’-8”) to support three floors and flat roof above – Dallas, TX (5/2014)
- Addition Foundation & Framing (approx. 500 SF) – Dallas, TX (5/2014)
- Patio Concrete Retaining Wall – Rockwall, TX (4/2014)
- Second Floor Addition & Balcony (approx. 1,100 SF) – Lewisville, TX (4/2014)
- Master Bathroom Addition Foundation (approx. 165 SF) – Dallas, TX (3/2014)
- Addition Pier & Beam Foundation (approx. 1,200 SF) to support first and second floor framing – Dallas, TX (3/2014)
- Garage & Patio Addition Foundation (approx. 1,500 SF) – Dallas, TX (2/2014)
- Kitchen Renovation (Ceiling Beam = 16’-2”, Header = 6’-0”) – Highland Village, TX (2/2014)
- Arbor (approx. 270 SF) Footings & Connections to support 8x8 wood posts – Southlake, TX (2/2014)
- Garage Addition Foundation – Lewisville, TX (1/2014)
- Renovation (approx. Ceiling Beams = 15’-0” & 18’-0”) – Southlake, TX (12/2013)
- Overhead Beam (approx. 13’-4”) – Allen, TX (11/2013)
- Kitchen Ceiling Beam (approx. 19’-2”) – Dallas, TX (10/2013)
- McKinney Tower Hotel – Dallas, TX (2008)
- The Westin Swan Point Resort & Spa Foundation & Framing – St. Charles Co., MD (2008)
- Suncreek United Methodist Church Addition Foundation & Framing – Allen, TX (2008)
- University Mall Renovation – Tampa, FL (2008)
- Drury Inn & Suites Hotel – Flagstaff, AZ (2006)
- Drury Inn & Suites Hotel – San Antonio, TX (2006)
- Drury Inn & Suites Hotel – Las Cruces, NM (2006)
- Metropolitan Baptist Church Foundation & Framing – Largo, MD (2006)
- Long Term Acute Unit (LTAC) Office Building Foundation – Grapevine, TX (2006)
- Bowman Office Building Foundation – Grapevine, TX (2006)
- Tom Muehlenbeck Recreation Center – Plano, TX (2005)
- Wysong Central Fire Station Foundation & Framing – McKinney, TX (2005)
- The Boardwalk at Town Center Apartment Foundation & Framing – The Woodlands, TX (2005)
- GE Modular Dialysis Office Building Foundation – Hillsboro, TX (2005)
- Warehouse Ceiling Beam Design – Dallas, TX (2004)
- State National Bank Cantilevered Retaining Walls Design (approx.. 600 LF) – Fort Worth, TX (2004)
- New Wood Beam Analysis & Design in the Crawl Space (existing structure) – Highland Park, TX (2004)
- New Steel Framing in the Crawl Space (existing structure) – Highland Park, TX (2002)
- Residential Foundation & Framing (approx.. 14,000 SF) – Westover Hills, TX (2001)
- The Broadway Plaza at Cityview, Independent Living Villas Foundation & Framing – Fort Worth, TX (2001)
- Bank Building Foundation & Framing (approx. 10,000 SF) – Mesquite, TX (2000)
- Residential Foundation (approx. 4,000 SF) – Waxahachie, TX (2000)
- Residential Foundation & Framing (approx. 5,000 SF) – Highland Park, TX (1998)
- Residential Addition Foundation (approx. 1,000 SF) – Dallas, TX (1998)
Forensic Engineering
- As-Built Roof Framing Analysis to support the proposed solar panels (2 structures) – Dallas, TX (3/2016)
- Construction Deficiencies regarding roof slopes, sheathing, and drainage and wall attachments of new two-story construction – Dallas, TX (2/2016)
- Metal Stair and Walkway Evaluation to suggest remedial actions at the apartment complex (19 buildings) – Haltom City, TX (2/2016)
- Arbor Framing & Foundation Review – McKinney, TX (2/2016)
- Tornado Distress Analysis to determine the extent of damage due to tornado on 12/26/2016 – Ovilla, TX (1/2016)
- Analyze and provide adequate bracings to structurally support the as-built roof framing condition – Dallas, TX (7/2015)
- Structure Fire Damage Evaluation to determine the extent of damage and suggest remedial actions – Garland, TX (1/2015)
- Proposed Door Opening at the Second Floor Master Bedroom/Hallway to determine if the proposed door framing is adequate and structurally sound – Flower Mound, TX (1/2015)
- Structure Fire Damage Evaluation to determine the extent of fire damage to the framing – McKinney, TX (12/2014)
- Structure Foundation Evaluation to determine if the existing foundation is structurally sound to support the newly one-story wood framing due to fire – Mansfield, TX (12/2014)
- Bathroom Addition Foundation movement Evaluation to determine if it is properly designed and/or constructed according to industry standard and suggest remedial actions – Dallas, TX (11/2014)
- Family Room Ceiling Gypsum Board Damage Evaluation due to insufficient supports of the roof framing – Plano, TX (11/2014)
- Two-Car Garage Header Deflection, Failure, and Re-design – Midlothian, TX (11/2014)
- Second Floor Renovation (approx. 1,000 SF) – Lewisville, TX (9/2014)
- Second Floor Subfloor Damage Evaluation including reported squeaky noises and bouncy when walking – Southlake, TX (9/2014)
- Load-Bearing Wall Evaluation to observe and determine the interior wall between the living room and kitchen is load-bearing wall or not that is proposed to remove and how to remove this wall – Fort Worth, TX (8/2014)
- Residential Sagging Porte Cochere Beam Evaluation at the left beam of the porte cochere due to undersize and not structurally sound in both strength and serviceability including appearance (approx. 500 SF) – Dallas, TX (7/2014)
- Brick Expansion Joint Distress Evaluation – Fort Worth, TX (7/2014)
- Vehicle Impact Damage Investigation to determine the extent of structural framing damage due to vehicle impact – Carrollton, TX (7/2014)
- Sagging Porte Cochere Structure Analysis, Re-design, and Repair (approx. 24’-0” x 52’-0”) between drive-up ATM machines and bank structure – Azle, TX (5/2014)
- Second Floor Room Addition (approx. 180 SF) – McKinney, TX (5/2014)
- Apartment Sloping Second Floor Evaluation & Re-design due to broken wood brace supporting the edge floor joist, Buildings 4 & 5 – Arlington, TX (5,9&11/2014)
- Existing Garage Steel Lintel Header Evaluation of 18 feet span due to sagging and inadequate sizing to support the brick veneer loads above – Southlake, TX (4/2014)
- Hallway Ceiling Beam for load-bearing wall removal – Fort Worth, TX (4/2014)
- Existing Patio Roof Framing Evaluation – Mesquite, TX (3/2014)
- As-Built Garage Ceiling Joist Evaluation to determine whether the joists can structurally support the second floor, offset exterior second floor brick wall, second floor ceiling, and second floor roof loads – Southlake, TX (2/2014)
- Commercial Building Foundation Performance Evaluation prior to purchase – Dallas, TX (2/2014)
- Arbor Header Connections Review – Prosper, TX (1/2014)
- Kitchen Renovation (2 Ceiling Beams & 3 Headers) – Arlington, TX (1/2014)
- Residential Roof Damage Evaluation to determine whether the weight of ice and snow from the ice storm in the North Texas area on December 5 & 6, 2013 has caused the damage to the roof framing – Fort Worth, TX (1/2014)
- Existing Garage Investigation & Re-design including 16’-0” garage header (approx. 400 SF) – Plano, TX (1/2014)
- Balcony improper steel framing investigation and re-design with wood framing (approx. 40 SF) – Mansfield, TX (11/2013)
- Damaged Roof Rafter Evaluation to determine the cause of damage to the roof rafter, the extent of roof framing damage, and suggest remedial repairs – Carrollton, TX (10/2013)
- Apartment Complex Stone Retaining Wall Assessment – Grand Prairie, TX (9/2013)
- Raytheon Warehouse, analysis of proposed telecommunication trays to be hung to the second floor in Wing B of the building – McKinney, TX (2005).
- Stonebriar Mall Parking Structure, Expansion Joint Connection Analysis & Design – Frisco, TX (2004)
- Alcatel Facility, analysis of proposed new cable trays to be hung from existing roof framing without ground support – Allen, TX (2001)
- Borden Dairy Milk Warehouse, analysis & design of a distressed steel beam & two concrete columns – Dallas, TX (2000)
- Calvary Cathedral Church Damage Investigation due to tornado on March 28, 2000 – Fort Worth, TX (2000)
- Huse Country Meat Storage Damage Investigation due to steel sub-frame failure – Malone, TX (1999)
Special Inspection
- Basement Standing Water Findings – Dallas, TX (1/2016)
- Breezeway & Garage Framing – McKinney, TX (11/2015)
- Pavilion Foundation Inspection including Roof, Elevation, Framing Floor & Foundation Plans – Southlake, TX (10/2015)
- Addition Foundation Inspection to support the proposed one-story framing structure (approx. 360 SF) – Cedar Hill, TX (8/2015)
- Existing Shed Foundation Inspection to determine whether foundation can structurally be supported the proposed one-story shed framing for storage, hobby, or workshop (approx. 340 SF) – Arlington, TX (1/2015)
- Arbor Foundation & Framing Review for permit – McKinney, TX (10/2014)
- New Structural Framing, Sizing, and Connection Inspection to determine if the overall new construction is properly installed in accordance with construction documents and standard building codes – Plano, TX (8/2014)
- Detached Garage Slab Foundation Evaluation to determine whether the garage foundation can structurally be supported the proposed two-story wood framing structure due to city permit issue (approx. 900 SF) – Fort Worth, TX (8/2014)
- Existing Detached Garage Foundation Evaluation to determine whether the garage foundation can structurally be supported the proposed single-story wood framing due to falling tree on top of the garage framing approximately 10 years ago for city permit – Dallas, TX (8/2014)
- As-Built Steel Frame Building Inspection to determine if it’s structurally sound for city permit (approx. 500 SF) – Mesquite, TX (7/2014)
- Patio Foundation & Framing Construction Documents Review – Southlake, TX (6/2014)
- As-Built Addition Foundation evaluation to determine whether the addition foundation is structurally sound to support the addition framing for city permit (approx. 500 SF) – Dallas, TX (5/2014)
- Existing Foundation Inspection to determine whether the existing concrete slab foundation can structurally support the additional loads for the new framing structure for city permit (approx. 100 SF) – Richardson, TX (1/2014)
- Post-Tensioned Slab Foundation Inspection prior to concrete placement (approx. 4,600 SF) – Mansfield, TX (8/2013)
- Auto Repair Shop Storage Subfloor Framing Evaluation and Layout including stair framing for city permit (approx. 1,000 SF) – Garland, TX (9/2013)
- Structural Study to support the cantilevered second floor master bedroom above the garage if the entire garage below is to be removed (9/2013)
- Gables Allen Street Project Apartment Foundation & Framing Inspection, 6 bldgs. – 7 stories (290 unit luxury), foundation & steel reinforcement of concrete walls & slabs (Outinord construction – “Tunnel Form”) – Dallas, TX (2000 & 2001)
- Cedar Springs at Turtle Creek Apartment Foundation & Framing Inspection, Bldg. A – 21 stories, Bldg. B, C & D – 16 stories, foundation & steel reinforcement of concrete walls & slabs (Outinord construction – “Tunnel Form”) – Dallas, TX (1999)
- The Villas at Turtle Creek Apartment Foundation & Framing Inspection, 14 stories, foundation & steel reinforcement of concrete walls & slabs (Outinord construction – “Tunnel Form”) – Dallas, TX (1998)